PLATFORM OVERVIEW

VANNIC GRiDMiND™

The supervisory intelligence platform that connects physical switchgear, edge computing, and preventive load control into a single unified operating layer.

GRiDMiND SUPERVISORY ENGINELIVE TELEMETRY
FEEDER: MAIN INCOMING L-4
R-PHASE
239.4 V
184.2 APF 0.98
Y-PHASE
240.1 V
182.8 APF 0.99
B-PHASE
238.9 V
185.1 APF 0.98
True Power Factor
0.985 Ind
Grid Frequency
50.02 Hz
Active Demand
128.4 kW
Harmonic THD_v
1.8% [Safe]
LOAD SUPERVISION & PREVENTIVE THRESHOLDSSYSTEM BALANCED
Priority 1: Core Process & Healthcare FeedersPROTECTED // LOCKED
Priority 2: Secondary Chiller / Motor BanksSURVEILLANCE ACTIVE
Priority 3: Approved Non-Critical Aux LoadsPRE-TRIP INTERLOCK READY
Sub-cycle Event Pre-Buffer: Armed
Demonstration engineering data
ENGINEERED CLARITY

Actionable Truth for Electrical Operators

Traditional building management systems bury electrical risks under generic HVAC screens, while basic meters only offer retrospective billing charts. GRiDMiND is purpose-built to deliver continuous electrical vigilance.

Continuous Three-Phase Balance Tracking
Calculates voltage and current unbalance ratios in real time to prevent motor insulation breakdown.
True-RMS Harmonics & Power Factor
Tracks total harmonic distortion on busbars and neutral conductors to preempt transformer overheating.
PLATFORM CAPABILITIES

Core Supervisory Modules

Built to meet the demands of commercial facility managers, plant maintenance teams, and consulting electrical engineers.

TELEMETRY

Real-Time Electrical Telemetry

Sub-second capture of True-RMS voltage, current, active/reactive power, power factor, frequency, and total harmonic distortion.

EDGE COMPUTING

Autonomous Edge Intelligence

Local anomaly detection algorithms that operate 24/7 inside the switchboard, completely independent of plant internet or cloud uptime.

CONTROL

Preventive Load Control Interlocks

Multi-tier priority control that sheds designated non-critical auxiliary loads before main breaker capacity or contract demand trips.

FORENSICS

Sub-Cycle Event & Pre-Fault Buffering

Preserves high-resolution electrical waveforms immediately prior to anomalous excursions for decisive root-cause analysis.

ANALYTICS

Demand & Tariff Optimization

Windowed kVA demand monitoring with predictive warnings to avoid costly utility demand ratchets and power factor penalty surcharges.

SUPERVISION

Multi-Panel Fleet Oversight

Single-pane supervision unifying main intake switchgear, sub-distribution boards, motor control centers, and auxiliary panels.

INTEGRATION

Brownfield Meter & Sensor Ingestion

Native RS-485 Modbus RTU interface connecting directly to existing energy meters, digital multi-function meters, and temperature probes.

RESILIENCE

Store-and-Forward Sync Architecture

Solid-state local buffer guarantees zero loss of electrical telemetry during factory network interruptions or wide-area link drops.

COMPLIANCE

Auditable Compliance & Incident Logs

Time-synchronized event logs provide definitive documentation for maintenance reviews, insurer audits, and utility queries.

OPERATIONAL WORKFLOW

How Operators Interact with GRiDMiND

From edge detection to supervisory verification, every stage is structured for fast engineering comprehension.

STEP 01

Real-Time Telemetry Ingestion

True-RMS sampling of 3-phase voltages, currents, power factors, and harmonics at distribution switchboards.

STEP 02

Edge Anomaly Detection

Deterministic algorithms compute negative phase sequence unbalance, rate of thermal rise, and kVA demand trends.

STEP 03

Preventive Load Control Action

Staged shedding or delayed interlock of approved non-critical loads before main capacity limits trip.

STEP 04

Forensic Event Archiving

Sub-cycle waveform pre-buffers and post-event stabilization metrics permanently logged for facility engineers.

STEP 05

Continuous Fleet Optimization

Aggregates multi-panel telemetry to identify chronic phase imbalance, low power factor feeders, and transformer health.

Experience VANNIC GRiDMiND in Your Facility

Schedule a technical consultation to explore brownfield compatibility with your existing switchgear and learn how preventive supervisory load control can protect critical uptime.

Request a Demo
CONNECTED STACK

Complete End-to-End Electrical Flow

VANNIC ties the physical power layer directly to local edge logic and central supervisory visibility.

Physical LayerSTAGE 01

Electrical Infrastructure

Switchgear & Busbars
415V LT / 11kV HT Panels • Incomer ACBs • MCCs

Three-phase incoming feeders, transformers, distribution panels, and inductive motor loads.

Sensing LayerSTAGE 02

Non-Intrusive Sensing

Split-Core Probes
True-RMS • 64+ Samples/Cycle • Class 0.5

Continuous sub-cycle current, voltage unbalance, power factor, and thermal signature ingestion.

Edge LayerSTAGE 03

Industrial Edge Controller

Deterministic Logic
< 20 ms Response • Offline Autonomous Engine

Embedded anomaly detection running independently of cloud, WiFi, or external network availability.

Control LayerSTAGE 04

Preventive Load Control

Supervisory Interlocks
Dry Contacts • Modbus RTU/TCP • Priority Tiers

Autonomous staged shedding of approved non-critical auxiliary loads before main capacity trips.

Supervisory LayerSTAGE 05

VANNIC GRiDMiND

Facility Console
Sub-Second Telemetry • Waveform Forensic Logs

Centralized visibility, event timeline reconstruction, and multi-site electrical fleet benchmarking.

Deterministic Edge Execution: Anomaly detection & preventive shedding cycle in < 20 ms without relying on cloud availability.
Continuous SupplySplit-Core IngestionAutonomous Local Edge

We use cookies and Google Analytics to understand how visitors use our site and improve the experience. By clicking "Accept", you consent to our use of these technologies.Privacy Policy.